You upload the tender package
The specification, the drawings, the IFC model and the enquiry letter. Drag them into the project, or send them in chat.
Tender package
Lindehof · 8 terraced houses · Timber facade cladding
Five steps. Modou does the reading and the working out. Every assumption waits for your approval.
Check one project free. No card needed.
The specification, the drawings, the IFC model and the enquiry letter. Drag them into the project, or send them in chat.
Lindehof · 8 terraced houses · Timber facade cladding
Every page of the specification, every drawing and the model. It notes which revision each drawing is, and lists every requirement that affects your price with its article and page.
Lindehof · 38 requirements, each linked to its page
It sets the specification, the drawings, the schedules and the model side by side. Where they disagree, you see both sources and Modou does not pick one. It flags genuine contradictions only: minimum 8 mm and 10 mm can both be true.

Lindehof · 8 terraced houses · Timber facade cladding
Flashing colour differs between documents.
Quantities come from the IFC model, measured with the build-ups in your own library. Then Modou works out what each build-up takes: the boards, battens, flashings and screws, laid out on stock lengths with a cut list and rounded to what you can order. Every line shows how it was worked out and which assumptions it rests on.

Lindehof · From the model: 47.0 m² net facade, 5 openings
| Item | Qty | Order | Status |
|---|---|---|---|
| Spruce board 18×145, 4.8 m | 88 | 11 packs | Released |
| Batten 28×50, 3.0 m | 40 | 40 lengths | Provisional |
| Breather membrane, black | 51.7 m² | 1 roll, 1.5 × 50 m | Released |
| Sill flashing, alu, 3.0 m | 6.1 m | 3 lengths | Colour open |
Window widths from the model 1.2 + 1.2 + 0.9 + 2.4 = 5.7 m+ 8 ends × 50 mm 0.4 m your rule= 6.1 m, cut from 3 lengths of 3,000 mm | |||
| Screw, stainless A2, 4.5×50 | 1,480 | 3 boxes of 500 | Released |
You approve each assumption. To change or reject one, you give a reason. Where the documents disagree, you choose which source leads. Then you export the order list and the quantities as a file for your calculation package. Modou never sends a quote.
Lindehof · South gable · 9 lines, 2 provisional
No card needed.
Ask where a quantity or an assumption comes from, in the dashboard or in Slack, Telegram or Discord. The answer points back to the document, the page and the working.
South gable
Where does the 6.1 m of sill flashing come from?
Every approval, correction and exclusion is kept with your reason, so a colleague can see why. Your build-ups and rules stay in your own library, so the next project starts from how you work.
You price in the calculation package you already use, with your own prices and hour norms. Modou hands over the order list and the checked quantities as Excel, CSV or CUF-XML files for packages such as Ibis, Kraan nCalc, Vakware, 2Jours, CIVIEL, Duncan and Bouw7. You import them yourself. CUF-XML is in pilot. Modou never suggests a price.
Schedule a meeting and we go through it together, or get a quote for your team.